Gallery

The first new building to form part of the expansion of the Airbus factory in Hamburg to house production facilities for the Airbus 380 is a steel structure with the main girders outside, spanning an unobstructed shop floor measuring 120 m x 350 m. The façades are divided into large areas of glazing and aluminium cladding with integrated ribbon glazing. Inside, three bar shaped building structures line each of the long sides.
Consultancy
2000 – 1st Rank
Design
Volkwin Marg with Marc Ziemons
Partner
Nikolaus Goetze
Client
Airbus Deutschland GmbH
Construction period
February – December 2002
Photographer
Heiner Leiska